References

Check out a showcase of our successful projects completed in cooperation with our clients.
Image
Categories
2023
  • City of Zagreb

    The construction of photovoltaic systems on the rooftops of buildings owned by the City of Zagreb and Zagrebački Holding d.o.o., Group 1 - Photovoltaic Power Plants - CITY OF ZAGREB (on 7 facilities, with a capacity of 100, 270, and 300 kW).

    Budget: 1.033.233,12 Eur
  • City of Zagreb

    The construction of 50 KW photovoltaic systems on the rooftops of buildings owned by Zagrebački Holding d.o.o., Group 2 - Photovoltaic Power Plant - Zagrebački Holding d.o.o.

    Budget: 41.668,54 Eur
  • Resalta d.o.o.

    Execution of works on the DC side of the construction of the photovoltaic 1.2 MW solar power plant "FNE LOG EXPERT THREE" for the use of renewable energy sources.

    Budget: 151.622,88 Eur
  • Municipality of Medulin

    Supply, delivery, and installation of a 12 KW photovoltaic power plant for the production of electrical energy on the building "Firefighter station Medulin".

    Budget: 13.235,86 Eur
  • Municipality of Medulin

    Supply, delivery, and installation of a 27.6 KW photovoltaic power plant for the production of electrical energy on the building "Polymer Kindergarten"

    Budget: 30.853,24 Eur
2022
  • Komunalije d.o.o. Novalja

    Design, construction and experimental work on the wastewater treatment plant of the Novalja agglomeration - UPOV Novalja "Vrtić"

    Budget: 942.597,39 Eur
  • Zagorski vodovod d.o.o.

    Construction of water supply system Lukovčak - high zone of the hamlet of Grki as part of the construction of the water supply system in the municipality of Đurmanec

    Budget: 13.906,45 Eur
  • Međimurske vode d.o.o.

    Construction of the supervisory and management system of water supply of Međimurje County - Phase III

    Budget: 381.174,37 Eur
  • Međimurske vode d.o.o.

    Reconstruction of distribution cabinets automatics and connection to UXO, VS Železna gora and VS Dragoslavec

    Budget: 13.958,08 Eur
  • Međimurske vode d.o.o.

    Reconstruction of electrical distribution cabinet Zdenac 2, pumping station Nedelišće

    Budget: 22.441,52 Eur
  • Međimurske vode d.o.o.

    Reconstruction of electrical distribution cabinet VT Sveti Urban

    Budget: 12.985,73 Eur
  • Vodoopskrba i odvodnja Zaprešić d.o.o.

    Upgrade and reconstruction of wastewater treatment plant of the Zaprešić agglomeration

    Budget: 1.372.461,74 Eur
  • Tekija d.o.o.

    Design and construction of wastewater treatment plant UPOV Pleternica 15.300 ES

    Budget: 491.074,39 Eur
  • Vode Jastrebarsko d.o.o.

    Programming of SCADA application for the work of UPOV Jastrebarsko (in progress)

    Budget: 123.284,01 Eur
  • Međimurske vode d.o.o.

    Works on the reconstruction of the main distribution cabinet at the Nedelišće Pumping Station

    Budget: 66.295,04 Eur
  • Međimurske vode d.o.o.

    Works on the reconstruction of the main distribution cabinet at the Prelog Pumping Site

    Budget: 66.188,86 Eur
  • Međimurske vode d.o.o.

    Works on reconstruction of distribution cabinets of the management building and Zdenca 1 at the Prelog Welling Site

    Budget: 65.949,57 Eur
  • Moslavina d.o.o.

    Reconstruction and construction of the public water supply and sanitation system: Group A.3 Reconstruction and construction of the public water supply and drainage system of the Kutina Agglomeration – II within the EU project Improvement of water-communal infrastructure of the Kutina Agglomeration

    Budget: 80.729,63 Eur
  • Vodoopskrba i odvodnja Zaprešić d.o.o.

    Construction of the sewerage network of the Kraj Donji Agglomeration within the EU project Improvement of water-utility infrastructure of the Zaprešić Agglomeration

    Budget: 235.369,53 Eur
  • Vodne usluge d.o.o.

    Reconstruction and construction of water supply and sewage systems within the EU project Development of water-communal infrastructure of the Križevci agglomeration

    Budget: 23.691,02 Eur
  • Međimurske vode d.o.o.

    Works on the reconstruction of distribution cabinets of automatics and connection to UXO

    Budget: 62.379,72 Eur
  • Grad Zagreb

    Replacement of the main distribution cabinet at the Gavella City Drama Theatre

    Budget: 29.567,69 Eur
  • Klinički bolnički centar Sestre milosrdnice

    Reconstruction works of transformer station 1TS651 of the Sestre milosrdnice University Hospital Center

    Budget: 430.889,02 Eur
  • HEP-Proizvodnja d.o.o.

    Workshop production of power manifolds and cabinets of measurement, control and regulation as part of the replacement of power supply and control systems in the cooling water pumping station TE-TO Sisak

    Budget: 159.154,69 Eur
  • HEP ODS d.o.o. Elektroslavonija Osijek

    Low voltage switchgear with additional field for connection of power plant / customer power of 100 kW to 500 kW for distribution area Elektroslavonija Osijek (framework agreement for 2 years is in progress)

    Budget: 221.353,49 Eur
  • HEP-Proizvodnja d.o.o.

    Delivery of materials and equipment, execution of electrical works, measurement, regulation and control works on the removal of the K7 boiler and the construction of low-pressure steam boiler No. 3 (in progress)

    Budget: 402.654,46 Eur
  • INA-Industrija nafte d.d.

    Delivery of spare parts and services for the maintenance of linear deep bore drainage systems with piston rods type SM

    Budget: 517.323,10 Eur
  • INA-Industrija nafte d.d.

    Procurement, delivery of equipment and execution of energy works at new substations with process code TS 384 and TS 390 in the Rijeka Oil Refinery

    Budget: 1.350.705,72 Eur
  • INA-Industrija nafte d.d.

    Production of RTU and PLC cabinets for new substations with process markIngs TS 384 and TS 390 in the Rijeka Oil Refinery (in progress)

    Budget: 90.941,67 Eur
2021
  • Varkom d.d.

    Construction of wastewater treatment plant UPOV Varaždinske Toplice (in progress)

    Budget: 154.266,13 Eur
  • Pragrande d.o.o.

    Reconstruction of Valkane wastewater treatment plant

    Budget: 116.235,22 Eur
  • Međimurske vode d.o.o.

    Reconstruction of electrical installations Zdenca 2 at the nedelišće water well

    Budget: 24.947,07 Eur
  • Međimurske vode d.o.o.

    Reconstruction of electrical installations on Zdenac 3 CP Nedelišće

    Budget: 20.271,61 Eur
  • Međimurske vode d.o.o.

    Reconstruction of electrical installations on PS Lopatinec

    Budget: 44.449,17 Eur
  • Vode Jastrebarsko d.o.o.

    Construction of water reservoirs and upgrading and reconstruction of wastewater drainage of the City of Jastrebarsko system from the area of Jastrebarsko agglomeration

    Budget: 107.612,25 Eur
  • Koprivničke vode d.o.o.

    Works on the expansion of the existing drainage system to new settlements in the Koprivnica agglomeration, Group 2. Electrical works and works on UXO within the EU project Improvement of water-communal infrastructure of the Koprivnica agglomeration

    Budget: 367.642,18 Eur
  • Koprivničke vode d.o.o.

    Works on the construction and reconstruction of the drainage and water supply system, construction and reconstruction of the UXO on the water supply and sewage system in the city of Koprivnica and the extension of the UPOV plant building, Group 2 – Elektroradovi and works on UXO within the EU project Improvement of water-communal infrastructure of the Koprivnica agglomeration (in progress)

    Budget: 1.034.045,70 Eur
  • 6. Maj odvodnja d.o.o.

    New construction and reconstruction of the drainage system, Group 1. Construction of connecting pipeline Savudrija - Umag to UPOV "Umag" and discharge of the device as part of the EU project Improvement of drainage and wastewater treatment systems in agglomerations Umag-Savudrija-Novigrad Istarski

    Budget: 89.416,83 Eur
  • 6. Maj odvodnja d.o.o.

    New construction and reconstruction of the drainage system, Group 2. New construction and reconstruction of the drainage system Savudrija – Umag within the EU project Improvement of drainage and wastewater treatment systems in agglomerations Umag-Savudrija-Novigrad Istarski

    Budget: 150.413,28 Eur
  • Izvor Ploče d .o.o.

    Wastewater collection and drainage system and rehabilitation of part of the water supply network of the Ploče Agglomeration within the EU project Construction of water-communal infrastructure of the Ploče agglomeration

    Budget: 683.634,25 Eur
  • Varkom d.d.

    Reconstruction, expansion and upgrading of the wastewater drainage system in the area of Varaždinske Toplice, Tuhovac, Lukačevac Toplički, Svibovec and Jalševac Svibovečki within the EU project Wastewater Drainage and Treatment System of the Varaždinske Toplice Agglomeration

    Budget: 74.948,74 Eur
  • Vertiv Croatia d.o.o.

    Electrical assembly, cabling and testing of data center module Edgeconnex AMS05PH02, AMS05PH03, AMS05PH04, AMS05PH05 and AMS05PH06

    Budget: 314.461,23 Eur
  • Vertiv Croatia d.o.o.

    Electrical assembly, cabling and testing of data center module IXCellerate MOS5

    Budget: 109.701,92 Eur
  • KBC Rijeka

    Production of electrical cabinets, wiring and assembly of manifolds for the needs of UHC Rijeka

    Budget: 363.740,63 Eur
  • Kamgrad objekti d.o.o.

    Workshop production and testing of electrical cabinets (fully made distribution cabinets) for the project "Residential and commercial building Gajnice"

    Budget: 11.603,03 Eur
  • HEP-Proizvodnja d.o.o.

    Production of a new automated power supply cabinet for all outdoor lighting in TE-TO Zagreb

    Budget: 16.796,25 Eur
  • HEP-Proizvodnja d.o.o.

    Reconstruction of power supply cabinets in the EX zone of the auxiliary boiler room for the needs of TE-TO Sisak

    Budget: 62.517,12 Eur
  • HEP d.d.

    Expansion of the existing system of protection of industrial process systems – phase 1

    Budget: 259.101,47 Eur
  • HEP Toplinarstvo d.o.o.

    Upgrading the SCADA system for controlling valves in the hot water pipeline shafts of the CTS-Sisak system

    Budget: 3.105,96 Eur
  • Perutnina Ptuj d.o.o. Slovenija

    Upgrade of the control system of cooling machines with the electrical cabinets included

    Budget: 432.029,25 Eur
  • Kutjevo d.d.

    Procurement and delivery of receiving scale software (PLC device, PC computer, SCADA runtime license, plc and scada program)

    Budget: 39.781,83 Eur
  • INA-Industrija nafte d.d.

    Procurement, delivery, installation and commissioning of communication (electro-instrumentation) equipment on the SCADA system of ESP systems group I, II and III, Croatia; Installation and commissioning of an electric submersible telemetry system; Installation and commissioning of the SCADA system in a central location.

    Budget: 3.328,29 Eur
  • HEP-Proizvodnja d.o.o.

    Reconstruction of YEAF35 rotobager power supply for TE-Plomin

    Budget: 75.652,00 Eur
2020
  • Zagorski vodovod d.o.o.

    Construction of water supply system of Zagorski vodovod in the area of Marija Bistrica Municipality, Water reservoir "Hum Bistrički"

    Budget: 17.833,48 Eur
  • Zagorski vodovod d.o.o.

    Construction of the water supply network of the High Zone of gornji macelj settlement

    Budget: 14.234,18 Eur
  • Končar-Distributivni i specijalni transformatori d.d.

    Expansion of distribution transformer test station (TS, LV, MV)

    Budget: 187.255,11 Eur
  • Međimurske vode d.o.o.

    Installation and configuration of the software platform of the monitoring and control system of water supply Nedelišće

    Budget: 49.107,44 Eur
  • Koprivničke vode d.o.o.

    Construction of secondary water supply network of Lukovec settlement

    Budget: 10.608,79 Eur
  • Međimurske vode d.o.o.

    Upgrade of the supervisory control system of water supply in Međimurje County – II. Phase

    Budget: 306.082,54 Eur
  • Međimurske vode d.o.o.

    Configuration of the water supply UXO system Phase II for the DNP3 protocol

    Budget: 5.521,27 Eur
  • Vodne usluge d.o.o. Bjelovar

    Equipping and commissioning of wells at the water well Delovi

    Budget: 35.626,26 Eur
  • Opća bolnica Dr. Ivo Pedišić u Sisku

    Electrical works on the reconstruction of the Complex of the General Hospital Dr. Ivo Pedišić in Sisak – construction of the Central Pavilion – Unified Emergency Hospital Reception (OHBP) and Day Hospital

    Budget: 171.354,13 Eur
  • Vodoopskrba i odvodnja Zaprešić d.o.o.

    Construction, reconstruction and rehabilitation of the sewerage network; reconstruction of the water supply network within the EU project Improvement of water-utility infrastructure of the Zaprešić Agglomeration

    Budget: 2.472.649,28 Eur
  • Zagorski vodovod d.o.o.

    Construction of sewerage networks of Zabok System and Zlatar System - Lot I and Lot III

    Budget: 712.057,87 Eur
  • Komunalije d.o.o. Novalja

    Rehabilitation and upgrading of the public water supply and drainage system of the Novalja agglomeration within the EU project Improvement of water and utility infrastructure of the Novalja agglomeration

    Budget: 899.268,35 Eur
  • Vode Lipik d.o.o.

    Reconstruction of the water supply system and construction and reconstruction of the drainage system within the EU project Improvement of water-communal infrastructure of the Lipik-Pakrac agglomeration

    Budget: 167.978,51 Eur
  • Vertiv Croatia d.o.o.

    Electrical assembly, cabling and testing of Data center module MEEZA DIA 03 Qatar (2*1 MW)

    Budget: 935.371,38 Eur
  • Vertiv Croatia d.o.o.

    Electrical assembly, cabling and testing of Data center Module WAW03 Warsaw (1 MW)

    Budget: 41.020,23 Eur
  • Vertiv Croatia d.o.o.

    Execution of electrical assembly, cabling and testing of Data center module ORANGE (200 kW)

    Budget: 14.604,82 Eur
  • Vertiv Croatia d.o.o.

    Execution of electrical assembly, cabling and testing of Data center module BECLOUD (2 MW)

    Budget: 32.745,37 Eur
  • Vertiv Croatia d.o.o.

    Execution of electrical assembly, cabling and testing of modules of the Data Center Russia 3 and 4 (IXCellerate-2) (1.2 MW)

    Budget: 41.977,12 Eur
  • Vertiv Croatia d.o.o.

    Execution of electrical assembly, cabling and testing of data center modules IS PARKLANDS IDC8

    Budget: 201.255,67 Eur
  • Alfa Stan Bužanova d.o.o.

    Construction of residential and commercial building Block Bužanova Štrigina

    Budget: 849.718,24 Eur
  • Sensa Nekretnine d.o.o.

    Production +LV and Distribution electrical cabinets for shopping center Špansko Z center

    Budget: 59.459,82 Eur
  • HEP-Proizvodnja d.o.o.

    Replacement of distribution cabinets in GHE Orlovac

    Budget: 56.892,29 Eur
  • INA-Industrija nafte d.d.

    Propane/Propylene splitter (PPS U-391 and PPS storage space U-335 and interconnecting) in the Rijeka oil refinery – execution of all installation works and commissioning of the process heating installation system

    Budget: 520.128,28 Eur
2019
  • Zagorski vodovod d.o.o.

    Construction of water supply system of Zagorski vodovod in the municipality of Marija Bistrica, Water supply of low zone of Marija Bistrica settlement, CERINE water reservoir

    Budget: 27.729,18 Eur
  • VIOP d.o.o.

    Construction of water supply system Žolekov Breg – pumping station "Košenine" and water tank and hydrostation "Žolekov Breg"

    Budget: 32.918,02 Eur
  • Komunalije d.o.o. Đurđevac

    Construction of secondary sewerage in Virje

    Budget: 14.671,64 Eur
  • Končar-Distributivni i specijalni transformatori d.d.

    Reconstruction and conversion of part of the distribution center Jankomir, Josipa Lončara 9a, Zagreb

    Budget: 173.997,44 Eur
  • JANAF

    Modernization of the fire alarm system, extension of the technical protection system with the integration of the fire alarm system and modernization and control of the extinguishing of the tank space of the Terminal Virje

    Budget: 173.769,20 Eur
  • Vertiv Croatia d.o.o.

    Electrical assembly, cabling and testing of Data Center Russia 1 and 2 modules (1.2 MW)

    Budget: 39.195,83 Eur
  • Ljekarne Plantak

    Execution of energy renovation works for Pharmacies Plantak, Electrical installations

    Budget: 37.097,64 Eur
  • HEP-Proizvodnja d.o.o.

    Reconstruction of the plant and pump management of well, drinking and technological water in the PLANT TE-TO Zagreb

    Budget: 437.976,60 Eur
  • HEP-Proizvodnja d.o.o.

    Delivery and installation of water flow meter through C4 block K

    Budget: 19.204,99 Eur
  • TE Plomin d.o.o.

    Reconstruction of lamellar precipitation plant (stormwater treatment plant) in TPP Plomin

    Budget: 54.125,81 Eur
  • Perutnina Ptuj-Pipo d.o.o. Čakovec

    Replacing outdated electrical cabinets, programming PLC devices and creating a new Turnkey SCADA application

    Budget: 64.298,26 Eur
2018
  • Zagrebački holding d.o.o.

    Distribution cabinets and installation equipment for connecting ICS pumps

    Budget: 51.540,36 Eur
  • Varkom d.d.

    A-3. Upgrading of the drainage system – Municipality of Vidovec and Maruševec within the EU project Drainage and Wastewater Treatment System of the Varaždin Agglomeration

    Budget: 538.681,69 Eur
  • HEP-Proizvodnja d.o.o.

    Procurement and installation of equipment for telemetry surveillance, collection, control and registration of accounting data of affected waters

    Budget: 14.566,97 Eur
  • TE Plomin d.o.o.

    Delivery of spare trays for MCC

    Budget: 19.244,34 Eur
  • HEP Toplinarstvo d.o.o.

    Electrical works on the reconstruction of thermal substations in J. Dobrile Street in Velika Gorica

    Budget: 9.345,74 Eur
  • HEP Proizvodnja d.o.o.

    Execution of electrical works, measurements, regulation and control on the construction of the second low-pressure steam boiler in the new boiler room (2x35 t/h) in the plant power - heating plant Zagreb, Zagorska 1

    Budget: 170.913,80 Eur
  • Pliva Hrvatska d.o.o.

    Execution of electrical installation works within the project SMJ-2050 – Peptides at the location Savski Marof, at the Sinteza SM2 plant

    Budget: 480.964,74 Eur
  • Pliva Hrvatska d.o.o.

    Execution of electrical installation works within the project SMJ-2010 – Sterile API at the location Savski Marof, at the Sinteza SM2 plant

    Budget: 205.003,92 Eur
  • INA-Industrija nafte d.d.

    Supply, installation and commissioning of a system of linear deep pump drives with piston rods for 13 wells

    Budget: 619.815,52 Eur
  • HEP-Proizvodnja d.o.o.

    Construction of a new low voltage distribution for the needs of EL-TO Zagreb

    Budget: 367.642,18 Eur
2017
  • Koprivničke vode d.o.o.

    Construction of sewage settlements Goričko, Kunovec and Botinovec Ivanečki

    Budget: 17.731,90 Eur
  • Vodovod i kanalizacija d.o.o. Split

    Procurement of goods and services for the purpose of rehabilitation of fecal pumping station Vukovarska

    Budget: 34.081,65 Eur
  • Moslavina d.o.o. Kutina

    Electrical installations within the construction of the main water supply System Kutina - Lipovljani

    Budget: 134.499,21 Eur
  • Zagrebački holding d.o.o.

    Delivery and installation of Utrina market power supply cabinets

    Budget: 5.637,14 Eur
  • HEP-Toplinarstvo d.o.o. Sisak

    Execution of works on the balancing system CTS Sisak

    Budget: 38.091,50 Eur
  • TE Plomin d.o.o.

    Replacement of auxiliary steam boiler - performance of power installations and installations for measurement, regulation and control

    Budget: 144.203,33 Eur
  • TE Plomin d.o.o.

    Replacement of MCC (Control of electric drives) of the boiler and engine room

    Budget: 762.757,98 Eur
  • HEP Toplinarstvo d.o.o.

    Execution of electrical works on 17 thermal stations in the City of Zagreb and at 8 stations in Cvjetno naselje, Velika Gorica

    Budget: 9.066,20 Eur
  • HEP Proizvodnja d.o.o.

    Execution of electrical and works on measurement, regulation and control on the construction of Steam Block boiler room in TE-TO Zagreb on the principle of "turnkey"

    Budget: 571.276,33 Eur
  • HEP Proizvodnja d.o.o.

    Replacement of cabinets of cooling water pumps in HPP Rijeka

    Budget: 23.755,39 Eur
  • Dukat d.d.

    Supply, installation and electrical connection of compressed air flow and consumption meters with integration into the monitoring system in Dukat factory, Zagreb, M. Čavića 9

    Budget: 25.170,75 Eur
  • Rafinerija nafte Brod d.d.

    Delivery of level radar meters

    Budget: 1.952,35 Eur
2016
  • Pragrande d.o.o.

    Supply and execution of works on the installation of the penstock on the Pragrande canal

    Budget: 205.331,10 Eur
  • Hidrobel d.o.o. Belišće

    Execution of electrical installation works as part of the construction of the drainage and wastewater treatment system of the Gat agglomeration (Construction of the sewage system of martijanci, Kunišinci and Tiborijanci settlements)

    Budget: 70.464,14 Eur
  • Općina Poličnik

    Construction of fecal and technological wastewater treatment plants in the Grabi Business Zone in the Municipality of Poličnik

    Budget: 145.284,75 Eur
  • Pliva Hrvatska d.o.o.

    Execution of prefabricated electrical and MUR works within the project SMJ-2052 - Increasing the capacity of the Wastewater Treatment Plant (WWTP)

    Budget: 107.020,31 Eur
  • Komunalije d.o.o. Đurđevac

    Execution of electrical installations within the construction of the Đurđevac water well - 2. Phase

    Budget: 279.904,50 Eur
  • Komunalno društvo Pag d.o.o.

    Construction of the "Vrčići" well on the island of Pag

    Budget: 196.621,20 Eur
  • Pragrande d.o.o.

    Development, installation, testing and handover of the supervisory control system of the sewerage system of the city of Pula

    Budget: 235.650,44 Eur
  • Pliva Hrvatska d.o.o.

    Production of electrical installations of the main distribution, weak and strong electricity on the New Building of Quality in Savski Marof

    Budget: 387.196,31 Eur
  • Pliva Hrvatska d.o.o.

    Works for replacing the medium voltage switchgear of the substation TS 5 SORBITOL

    Budget: 41.903,31 Eur
  • HEP Proizvodnja d.o.o.

    Execution of electrical works on the construction of the boiler room for a new low pressure steam boiler in the Plant Power Plant - Heating Plant, Zagreb, Zagorska 1, according to the turnkey system

    Budget: 256.953,48 Eur
  • KIM Mljekara Karlovac d.o.o.

    Supply, installation and connection of flow and energy meters and equipment for displaying and visualization of measuring points with the option of archiving and viewing data from the archives in the Kim Karlovac Factory, Mekušanska c. 51.

    Budget: 64.370,56 Eur
  • INA-Industrija nafte d.d.

    Procurement, implementation and commissioning of process analyzers of dew point of water and hydrocarbons

    Budget: 283.230,47 Eur
2015
  • Vode Vrbovsko d.o.o.

    Expansion of the existing supervisory control system on the water supply system of the city of Vrbovsko

    Budget: 24.939,52 Eur
  • Vodoopskrba i odvodnja Zaprešić d.o.o.

    Delivery and installation of computer and software equipment - telemetry for existing water supply and sewage systems

    Budget: 89.884,27 Eur
  • Komunalac Pakrac d.o.o.

    Execution of electrical works on the inclusion of the Pumping Site "Gaj" in the water supply system Pakrac-Lipik

    Budget: 188.688,65 Eur
  • Vodoopskrba i odvodnja Zaprešić d.o.o.

    Execution of works on the installation of a new Monitoring and Control System at the Central Wastewater Treatment Plant in Zaprešić

    Budget: 50.125,72 Eur
  • Pliva Hrvatska d.o.o.

    Technological and non-technological electrical installations (Sinteza SM2 - Upgrade of API plant in Savski Marof)

    Budget: 1.308.484,20 Eur
  • Pliva Hrvatska d.o.o.

    TS and LV distribution, SMJ-1900 (Execution of electrical installations on the construction of a transformer station and low-voltage distribution in Savski Marof)

    Budget: 505.957,86 Eur
2014
  • Vode Vrbovsko d.o.o.

    Supervisory control system of the water supply system of the City of Vrbovsko - Phase II

    Budget: 96.415,48 Eur
2013
  • Moslavina d.o.o.

    Construction of access road and connecting pipelines at the "Osekovo" pumping site and equipping wells LoPoZ-1 and LoPoZ-3

    Budget: 206.259,52 Eur
  • Virkom d.o.o.

    Construction of drinking water treatment plant - Bikana Virovitica – reconstruction and upgrading

    Budget: 176.631,60 Eur
  • Komunalno poduzeće d.o.o. Križevci

    Supervisory control system of the water supply system of the city of Križevci - 2nd phase of realization (15 water supply stations)

    Budget: 109.081,16 Eur
  • Pliva Hrvatska d.o.o.

    Execution of electrical works on the reconstruction of wastewater treatment plant SOOV (WWTP Pliva Savski Marof)

    Budget: 196.073,00 Eur
2012
  • Vode Vrbovsko d.o.o.

    Supervisory control system of the water supply system of the City of Vrbovsko - Phase I

    Budget: 64.747,49 Eur
  • TPK Orometal d.d.

    Electric motor and low voltage electrical distribution, lighting, grounding and lightning protection of the Hospira steam boiler room

    Budget: 133.360,26 Eur
2010
  • Virkom d.o.o.

    Adaptation of the water filtration line at the Bikana Water Well

    Budget: 745.709,65 Eur
2009
  • Pliva Hrvatska d.o.o.

    Sanitary and technological wastewater drainage of pliva location in Savski Marof, SMJ-1600 ICS

    Budget: 379.715,86 Eur
  • Pliva Hrvatska d.o.o.

    Sanitary and technological wastewater drainage of Pliva location in Savski Marof, SMJ-1600 ICS

    Budget: 379.715,86 Eur
2008
  • Virkom d.o.o.

    Adaptation of the water filtration line at the Bikana Water Well

    Budget: 425.937,97 Eur
1882