City of Senj
Construction of a hydroelectric power station in City of Senj
Budget: 19.314,79 Eur
Construction of a hydroelectric power station in City of Senj
Budget: 19.314,79 EurCarrying out work on installing photovoltaic power plants on public buildings
Budget: 48.814,00 EurReplacement of DC converter for mud pump control on CROSCO jack-up drilling platform Labin
Budget: 77.697,00 EurPerforming electrical installations on STCPP modules
Budget: 26.953,00 EurPerforming electrical installations on MIL01C modules
Budget: 299.434,10 EurConstruction of a solar power plant as part of the project to upgrade a preschool institution in the City of Slunj
Budget: 57.294,55 EurPerforming electrical work on the modules of the EdgeConnex AMS07 project
Budget: 764.563,98 EurDesign and construction of SE-6967 on the roof of the Parish of St. John Bosco (Podsused)
Budget: 17.630,30 EurReconstruction of LV facilities in TS2 - HRT
Budget: 704.891,00 EurReconstruction of electrical cabinets and replacement of SCADA system at the UPPV of the Jakuševec landfill
Budget: 79.428,37 EurThe construction of photovoltaic systems on the rooftops of buildings owned by the City of Zagreb and Zagrebački Holding d.o.o., Group 1 - Photovoltaic Power Plants - CITY OF ZAGREB (on 7 facilities, with a capacity of 100, 270, and 300 kW).
Budget: 1.033.233,12 EurThe construction of 50 KW photovoltaic systems on the rooftops of buildings owned by Zagrebački Holding d.o.o., Group 2 - Photovoltaic Power Plant - Zagrebački Holding d.o.o.
Budget: 41.668,54 EurExecution of works on the DC side of the construction of the photovoltaic 1.2 MW solar power plant "FNE LOG EXPERT THREE" for the use of renewable energy sources.
Budget: 151.622,88 EurSupply, delivery, and installation of a 12 KW photovoltaic power plant for the production of electrical energy on the building "Firefighter station Medulin".
Budget: 13.235,86 EurSupply, delivery, and installation of a 27.6 KW photovoltaic power plant for the production of electrical energy on the building "Polymer Kindergarten"
Budget: 30.853,24 EurDesign, construction and experimental work on the wastewater treatment plant of the Novalja agglomeration - UPOV Novalja "Vrtić"
Budget: 942.597,39 EurConstruction of water supply system Lukovčak - high zone of the hamlet of Grki as part of the construction of the water supply system in the municipality of Đurmanec
Budget: 13.906,45 EurConstruction of the supervisory and management system of water supply of Međimurje County - Phase III
Budget: 381.174,37 EurReconstruction of distribution cabinets automatics and connection to UXO, VS Železna gora and VS Dragoslavec
Budget: 13.958,08 EurReconstruction of electrical distribution cabinet Zdenac 2, pumping station Nedelišće
Budget: 22.441,52 EurReconstruction of electrical distribution cabinet VT Sveti Urban
Budget: 12.985,73 EurUpgrade and reconstruction of wastewater treatment plant of the Zaprešić agglomeration
Budget: 1.372.461,74 EurDesign and construction of wastewater treatment plant UPOV Pleternica 15.300 ES
Budget: 491.074,39 EurProgramming of SCADA application for the work of UPOV Jastrebarsko (in progress)
Budget: 123.284,01 EurWorks on the reconstruction of the main distribution cabinet at the Nedelišće Pumping Station
Budget: 66.295,04 EurWorks on the reconstruction of the main distribution cabinet at the Prelog Pumping Site
Budget: 66.188,86 EurWorks on reconstruction of distribution cabinets of the management building and Zdenca 1 at the Prelog Welling Site
Budget: 65.949,57 EurReconstruction and construction of the public water supply and sanitation system: Group A.3 Reconstruction and construction of the public water supply and drainage system of the Kutina Agglomeration – II within the EU project Improvement of water-communal infrastructure of the Kutina Agglomeration
Budget: 80.729,63 EurConstruction of the sewerage network of the Kraj Donji Agglomeration within the EU project Improvement of water-utility infrastructure of the Zaprešić Agglomeration
Budget: 235.369,53 EurReconstruction and construction of water supply and sewage systems within the EU project Development of water-communal infrastructure of the Križevci agglomeration
Budget: 23.691,02 EurWorks on the reconstruction of distribution cabinets of automatics and connection to UXO
Budget: 62.379,72 EurReplacement of the main distribution cabinet at the Gavella City Drama Theatre
Budget: 29.567,69 EurReconstruction works of transformer station 1TS651 of the Sestre milosrdnice University Hospital Center
Budget: 430.889,02 EurWorkshop production of power manifolds and cabinets of measurement, control and regulation as part of the replacement of power supply and control systems in the cooling water pumping station TE-TO Sisak
Budget: 159.154,69 EurLow voltage switchgear with additional field for connection of power plant / customer power of 100 kW to 500 kW for distribution area Elektroslavonija Osijek (framework agreement for 2 years is in progress)
Budget: 221.353,49 EurDelivery of materials and equipment, execution of electrical works, measurement, regulation and control works on the removal of the K7 boiler and the construction of low-pressure steam boiler No. 3 (in progress)
Budget: 402.654,46 EurDelivery of spare parts and services for the maintenance of linear deep bore drainage systems with piston rods type SM
Budget: 517.323,10 EurProcurement, delivery of equipment and execution of energy works at new substations with process code TS 384 and TS 390 in the Rijeka Oil Refinery
Budget: 1.350.705,72 EurProduction of RTU and PLC cabinets for new substations with process markIngs TS 384 and TS 390 in the Rijeka Oil Refinery (in progress)
Budget: 90.941,67 EurConstruction of wastewater treatment plant UPOV Varaždinske Toplice (in progress)
Budget: 154.266,13 EurReconstruction of Valkane wastewater treatment plant
Budget: 116.235,22 EurReconstruction of electrical installations Zdenca 2 at the nedelišće water well
Budget: 24.947,07 EurReconstruction of electrical installations on Zdenac 3 CP Nedelišće
Budget: 20.271,61 EurReconstruction of electrical installations on PS Lopatinec
Budget: 44.449,17 EurConstruction of water reservoirs and upgrading and reconstruction of wastewater drainage of the City of Jastrebarsko system from the area of Jastrebarsko agglomeration
Budget: 107.612,25 EurWorks on the expansion of the existing drainage system to new settlements in the Koprivnica agglomeration, Group 2. Electrical works and works on UXO within the EU project Improvement of water-communal infrastructure of the Koprivnica agglomeration
Budget: 367.642,18 EurWorks on the construction and reconstruction of the drainage and water supply system, construction and reconstruction of the UXO on the water supply and sewage system in the city of Koprivnica and the extension of the UPOV plant building, Group 2 – Elektroradovi and works on UXO within the EU project Improvement of water-communal infrastructure of the Koprivnica agglomeration (in progress)
Budget: 1.034.045,70 EurNew construction and reconstruction of the drainage system, Group 1. Construction of connecting pipeline Savudrija - Umag to UPOV "Umag" and discharge of the device as part of the EU project Improvement of drainage and wastewater treatment systems in agglomerations Umag-Savudrija-Novigrad Istarski
Budget: 89.416,83 EurNew construction and reconstruction of the drainage system, Group 2. New construction and reconstruction of the drainage system Savudrija – Umag within the EU project Improvement of drainage and wastewater treatment systems in agglomerations Umag-Savudrija-Novigrad Istarski
Budget: 150.413,28 EurWastewater collection and drainage system and rehabilitation of part of the water supply network of the Ploče Agglomeration within the EU project Construction of water-communal infrastructure of the Ploče agglomeration
Budget: 683.634,25 EurReconstruction, expansion and upgrading of the wastewater drainage system in the area of Varaždinske Toplice, Tuhovac, Lukačevac Toplički, Svibovec and Jalševac Svibovečki within the EU project Wastewater Drainage and Treatment System of the Varaždinske Toplice Agglomeration
Budget: 74.948,74 EurElectrical assembly, cabling and testing of data center module Edgeconnex AMS05PH02, AMS05PH03, AMS05PH04, AMS05PH05 and AMS05PH06
Budget: 314.461,23 EurElectrical assembly, cabling and testing of data center module IXCellerate MOS5
Budget: 109.701,92 EurProduction of electrical cabinets, wiring and assembly of manifolds for the needs of UHC Rijeka
Budget: 363.740,63 EurWorkshop production and testing of electrical cabinets (fully made distribution cabinets) for the project "Residential and commercial building Gajnice"
Budget: 11.603,03 EurProduction of a new automated power supply cabinet for all outdoor lighting in TE-TO Zagreb
Budget: 16.796,25 EurReconstruction of power supply cabinets in the EX zone of the auxiliary boiler room for the needs of TE-TO Sisak
Budget: 62.517,12 EurExpansion of the existing system of protection of industrial process systems – phase 1
Budget: 259.101,47 EurUpgrading the SCADA system for controlling valves in the hot water pipeline shafts of the CTS-Sisak system
Budget: 3.105,96 EurUpgrade of the control system of cooling machines with the electrical cabinets included
Budget: 432.029,25 EurProcurement and delivery of receiving scale software (PLC device, PC computer, SCADA runtime license, plc and scada program)
Budget: 39.781,83 EurProcurement, delivery, installation and commissioning of communication (electro-instrumentation) equipment on the SCADA system of ESP systems group I, II and III, Croatia; Installation and commissioning of an electric submersible telemetry system; Installation and commissioning of the SCADA system in a central location.
Budget: 3.328,29 EurReconstruction of YEAF35 rotobager power supply for TE-Plomin
Budget: 75.652,00 EurConstruction of water supply system of Zagorski vodovod in the area of Marija Bistrica Municipality, Water reservoir "Hum Bistrički"
Budget: 17.833,48 EurConstruction of the water supply network of the High Zone of gornji macelj settlement
Budget: 14.234,18 EurExpansion of distribution transformer test station (TS, LV, MV)
Budget: 187.255,11 EurInstallation and configuration of the software platform of the monitoring and control system of water supply Nedelišće
Budget: 49.107,44 EurConstruction of secondary water supply network of Lukovec settlement
Budget: 10.608,79 EurUpgrade of the supervisory control system of water supply in Međimurje County – II. Phase
Budget: 306.082,54 EurConfiguration of the water supply UXO system Phase II for the DNP3 protocol
Budget: 5.521,27 EurEquipping and commissioning of wells at the water well Delovi
Budget: 35.626,26 EurElectrical works on the reconstruction of the Complex of the General Hospital Dr. Ivo Pedišić in Sisak – construction of the Central Pavilion – Unified Emergency Hospital Reception (OHBP) and Day Hospital
Budget: 171.354,13 EurConstruction, reconstruction and rehabilitation of the sewerage network; reconstruction of the water supply network within the EU project Improvement of water-utility infrastructure of the Zaprešić Agglomeration
Budget: 2.472.649,28 EurConstruction of sewerage networks of Zabok System and Zlatar System - Lot I and Lot III
Budget: 712.057,87 EurRehabilitation and upgrading of the public water supply and drainage system of the Novalja agglomeration within the EU project Improvement of water and utility infrastructure of the Novalja agglomeration
Budget: 899.268,35 EurReconstruction of the water supply system and construction and reconstruction of the drainage system within the EU project Improvement of water-communal infrastructure of the Lipik-Pakrac agglomeration
Budget: 167.978,51 EurElectrical assembly, cabling and testing of Data center module MEEZA DIA 03 Qatar (2*1 MW)
Budget: 935.371,38 EurElectrical assembly, cabling and testing of Data center Module WAW03 Warsaw (1 MW)
Budget: 41.020,23 EurExecution of electrical assembly, cabling and testing of Data center module ORANGE (200 kW)
Budget: 14.604,82 EurExecution of electrical assembly, cabling and testing of Data center module BECLOUD (2 MW)
Budget: 32.745,37 EurExecution of electrical assembly, cabling and testing of modules of the Data Center Russia 3 and 4 (IXCellerate-2) (1.2 MW)
Budget: 41.977,12 EurExecution of electrical assembly, cabling and testing of data center modules IS PARKLANDS IDC8
Budget: 201.255,67 EurConstruction of residential and commercial building Block Bužanova Štrigina
Budget: 849.718,24 EurProduction +LV and Distribution electrical cabinets for shopping center Špansko Z center
Budget: 59.459,82 EurReplacement of distribution cabinets in GHE Orlovac
Budget: 56.892,29 EurPropane/Propylene splitter (PPS U-391 and PPS storage space U-335 and interconnecting) in the Rijeka oil refinery – execution of all installation works and commissioning of the process heating installation system
Budget: 520.128,28 EurConstruction of water supply system of Zagorski vodovod in the municipality of Marija Bistrica, Water supply of low zone of Marija Bistrica settlement, CERINE water reservoir
Budget: 27.729,18 EurConstruction of water supply system Žolekov Breg – pumping station "Košenine" and water tank and hydrostation "Žolekov Breg"
Budget: 32.918,02 EurConstruction of secondary sewerage in Virje
Budget: 14.671,64 EurReconstruction and conversion of part of the distribution center Jankomir, Josipa Lončara 9a, Zagreb
Budget: 173.997,44 EurModernization of the fire alarm system, extension of the technical protection system with the integration of the fire alarm system and modernization and control of the extinguishing of the tank space of the Terminal Virje
Budget: 173.769,20 EurElectrical assembly, cabling and testing of Data Center Russia 1 and 2 modules (1.2 MW)
Budget: 39.195,83 EurExecution of energy renovation works for Pharmacies Plantak, Electrical installations
Budget: 37.097,64 EurReconstruction of the plant and pump management of well, drinking and technological water in the PLANT TE-TO Zagreb
Budget: 437.976,60 EurDelivery and installation of water flow meter through C4 block K
Budget: 19.204,99 EurReconstruction of lamellar precipitation plant (stormwater treatment plant) in TPP Plomin
Budget: 54.125,81 EurReplacing outdated electrical cabinets, programming PLC devices and creating a new Turnkey SCADA application
Budget: 64.298,26 EurDistribution cabinets and installation equipment for connecting ICS pumps
Budget: 51.540,36 EurA-3. Upgrading of the drainage system – Municipality of Vidovec and Maruševec within the EU project Drainage and Wastewater Treatment System of the Varaždin Agglomeration
Budget: 538.681,69 EurProcurement and installation of equipment for telemetry surveillance, collection, control and registration of accounting data of affected waters
Budget: 14.566,97 EurDelivery of spare trays for MCC
Budget: 19.244,34 EurElectrical works on the reconstruction of thermal substations in J. Dobrile Street in Velika Gorica
Budget: 9.345,74 EurExecution of electrical works, measurements, regulation and control on the construction of the second low-pressure steam boiler in the new boiler room (2x35 t/h) in the plant power - heating plant Zagreb, Zagorska 1
Budget: 170.913,80 EurExecution of electrical installation works within the project SMJ-2050 – Peptides at the location Savski Marof, at the Sinteza SM2 plant
Budget: 480.964,74 EurExecution of electrical installation works within the project SMJ-2010 – Sterile API at the location Savski Marof, at the Sinteza SM2 plant
Budget: 205.003,92 EurSupply, installation and commissioning of a system of linear deep pump drives with piston rods for 13 wells
Budget: 619.815,52 EurConstruction of a new low voltage distribution for the needs of EL-TO Zagreb
Budget: 367.642,18 EurConstruction of sewage settlements Goričko, Kunovec and Botinovec Ivanečki
Budget: 17.731,90 EurProcurement of goods and services for the purpose of rehabilitation of fecal pumping station Vukovarska
Budget: 34.081,65 EurElectrical installations within the construction of the main water supply System Kutina - Lipovljani
Budget: 134.499,21 EurDelivery and installation of Utrina market power supply cabinets
Budget: 5.637,14 EurExecution of works on the balancing system CTS Sisak
Budget: 38.091,50 EurReplacement of auxiliary steam boiler - performance of power installations and installations for measurement, regulation and control
Budget: 144.203,33 EurReplacement of MCC (Control of electric drives) of the boiler and engine room
Budget: 762.757,98 EurExecution of electrical works on 17 thermal stations in the City of Zagreb and at 8 stations in Cvjetno naselje, Velika Gorica
Budget: 9.066,20 EurExecution of electrical and works on measurement, regulation and control on the construction of Steam Block boiler room in TE-TO Zagreb on the principle of "turnkey"
Budget: 571.276,33 EurReplacement of cabinets of cooling water pumps in HPP Rijeka
Budget: 23.755,39 EurSupply, installation and electrical connection of compressed air flow and consumption meters with integration into the monitoring system in Dukat factory, Zagreb, M. Čavića 9
Budget: 25.170,75 EurDelivery of level radar meters
Budget: 1.952,35 EurSupply and execution of works on the installation of the penstock on the Pragrande canal
Budget: 205.331,10 EurExecution of electrical installation works as part of the construction of the drainage and wastewater treatment system of the Gat agglomeration (Construction of the sewage system of martijanci, Kunišinci and Tiborijanci settlements)
Budget: 70.464,14 EurConstruction of fecal and technological wastewater treatment plants in the Grabi Business Zone in the Municipality of Poličnik
Budget: 145.284,75 EurExecution of prefabricated electrical and MUR works within the project SMJ-2052 - Increasing the capacity of the Wastewater Treatment Plant (WWTP)
Budget: 107.020,31 EurExecution of electrical installations within the construction of the Đurđevac water well - 2. Phase
Budget: 279.904,50 EurConstruction of the "Vrčići" well on the island of Pag
Budget: 196.621,20 EurDevelopment, installation, testing and handover of the supervisory control system of the sewerage system of the city of Pula
Budget: 235.650,44 EurProduction of electrical installations of the main distribution, weak and strong electricity on the New Building of Quality in Savski Marof
Budget: 387.196,31 EurWorks for replacing the medium voltage switchgear of the substation TS 5 SORBITOL
Budget: 41.903,31 EurExecution of electrical works on the construction of the boiler room for a new low pressure steam boiler in the Plant Power Plant - Heating Plant, Zagreb, Zagorska 1, according to the turnkey system
Budget: 256.953,48 EurSupply, installation and connection of flow and energy meters and equipment for displaying and visualization of measuring points with the option of archiving and viewing data from the archives in the Kim Karlovac Factory, Mekušanska c. 51.
Budget: 64.370,56 EurProcurement, implementation and commissioning of process analyzers of dew point of water and hydrocarbons
Budget: 283.230,47 EurExpansion of the existing supervisory control system on the water supply system of the city of Vrbovsko
Budget: 24.939,52 EurDelivery and installation of computer and software equipment - telemetry for existing water supply and sewage systems
Budget: 89.884,27 EurExecution of electrical works on the inclusion of the Pumping Site "Gaj" in the water supply system Pakrac-Lipik
Budget: 188.688,65 EurExecution of works on the installation of a new Monitoring and Control System at the Central Wastewater Treatment Plant in Zaprešić
Budget: 50.125,72 EurTechnological and non-technological electrical installations (Sinteza SM2 - Upgrade of API plant in Savski Marof)
Budget: 1.308.484,20 EurTS and LV distribution, SMJ-1900 (Execution of electrical installations on the construction of a transformer station and low-voltage distribution in Savski Marof)
Budget: 505.957,86 EurSupervisory control system of the water supply system of the City of Vrbovsko - Phase II
Budget: 96.415,48 EurConstruction of access road and connecting pipelines at the "Osekovo" pumping site and equipping wells LoPoZ-1 and LoPoZ-3
Budget: 206.259,52 EurConstruction of drinking water treatment plant - Bikana Virovitica – reconstruction and upgrading
Budget: 176.631,60 EurSupervisory control system of the water supply system of the city of Križevci - 2nd phase of realization (15 water supply stations)
Budget: 109.081,16 EurExecution of electrical works on the reconstruction of wastewater treatment plant SOOV (WWTP Pliva Savski Marof)
Budget: 196.073,00 EurSupervisory control system of the water supply system of the City of Vrbovsko - Phase I
Budget: 64.747,49 EurElectric motor and low voltage electrical distribution, lighting, grounding and lightning protection of the Hospira steam boiler room
Budget: 133.360,26 EurAdaptation of the water filtration line at the Bikana Water Well
Budget: 745.709,65 EurSanitary and technological wastewater drainage of pliva location in Savski Marof, SMJ-1600 ICS
Budget: 379.715,86 EurSanitary and technological wastewater drainage of Pliva location in Savski Marof, SMJ-1600 ICS
Budget: 379.715,86 EurAdaptation of the water filtration line at the Bikana Water Well
Budget: 425.937,97 Eur